Blog - Lixin Valve Group Co., Ltd
Join Lixin Valve at Valve World Asia 2024

Valve World Asia Expo & Conference 2024: Lixin Valve Group Co., Ltd. Invites You to Booth A49 We are thrilled to announce that Lixin Valve Group Co., Ltd. will be participating...

It is necessary to verify that the upstream and downstream pipelines of the valve have been relieved of pressure before disassembling and disassembling

The valve is forbidden to be transported by hanging on the handwheel with a hook. Before the valve is used, both ends of the flow channel must be plugged with valve sleeves to prev...

Valve Installation

The pipelines before and after the valve are ready, the pipelines should be coaxial, and the sealing surfaces of the two flanges of the flange connection valve should be parallel. The threaded connection v...

Lixin
Read More
Valve Installation

New Year’s greetings Strive for a New Era    Strive for a New Journey Starting a New Journey     Realizing a New Leap   New Year’s greetings The rhythm returns to the spring, and the myriad phenomena begin to renew On the occasion of farewell to the old and welcoming the new, the Chairman of Lixin Valve, […]

Lixin
Read More
Is it difficult for you to choose which valve? Please send us your questions and we will give you a detailed plan.
Question

GET A QUOTE

GET IN TOUCH NOW
×